Maximizing Efficiency: A Comprehensive Guide To Solar Glass Curtain Wall Installation Solutions

Views: 0     Author: Site Editor     Publish Time: 2024-09-22      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button


1 - As a high-tech product that integrates architectural aesthetics and green energy production

As a high-tech product that integrates architectural aesthetics and green energy production, the installation process of solar glass curtain walls requires high technical standards and attention to detail. This article elaborates on the installation solutions for photovoltaic curtain walls, including construction preparation, construction procedures, safety and quality control, system commissioning, and acceptance criteria.





Construction Preparation


Before construction, it is essential to ensure that all design documents are complete, including construction drawings, design specifications, and calculations. Additionally, construction personnel must receive professional training to ensure they are familiar with the characteristics and installation requirements of solar glass curtain walls.


2-1 Construction Preparation for solar glass curtain wall
2-2 Construction Preparation for solar glass curtain wall




Construction Process


1. Site Layout and Material Preparation: Technicians perform precise layouts on-site based on the design drawings and prepare the material list.

2. Factory Processing: The manufacturer processes solar photovoltaic glass modules and required profiles according to the material list.

3. Material Arrival and Hoisting: Once materials are processed, they are transported to the construction site and hoisted into place.

4. Support Framework Installation: Install the support framework for the solar glass curtain wall to ensure structural stability.

5. Cable Duct Installation: Install cable ducts to prepare for the subsequent electrical wiring.

6. Installation and Wiring: Install solar glass according to design specifications and carry out electrical wiring.

7. Sealing and Inspection: Complete sealing between the solar glass and framework, followed by a thorough inspection.

8. Inverter Installation and Interior Finishing: Install the inverter and finish the indoor work.


3 Construction Process for solar glass curtain wall




Safety and Quality Control


Safety is the primary consideration during the construction process. All construction personnel must adhere to safety operating procedures and use qualified safety equipment. Quality control involves strict inspection of solar photovoltaic glass modules, electrical equipment, and connection lines to ensure accurate installation, secure connections and proper sealing.


4 Safety and Quality Control




System Commissioning and Operation


After the system installation is complete, commissioning and operation are conducted, including:


1. Grounding and Equipotential Bonding Inspection: Ensure the grounding system meets requirements and that equipotential connections are correct.

2. Module Inspection: Confirm that solar photovoltaic glass modules are undamaged, adequately ventilated and that connections are secure.

3. Electrical Equipment Inspection: Check that electrical equipment, such as inverters and combiner boxes, is functioning normally.

4. Pre-Grid Connection Testing: Perform necessary electrical tests before grid connection to ensure the system meets grid connection requirements.



5 System Commissioning and Operation





Acceptance Standards


The acceptance of solar glass curtain walls should follow these standards:


1. Compliance with Design Documents: Ensure that the construction results align with the design documents.

2. Installation Quality: The installation quality of solar photovoltaic glass modules, brackets, and electrical equipment meets the required standards.

3. System Performance: The photovoltaic system's power generation efficiency and safety performance meet the design requirements.

4. Document Completeness: All documentation, including construction records, test reports, and acceptance documents, must be complete.

5. Training and Maintenance: Provide operational training for users and offer a detailed maintenance manual.


6 Acceptance Standards




The installation of solar glass curtain walls is a systematic project that involves multiple stages, including design, materials, construction, debugging, and acceptance. Through a professional construction team, strict quality control, and comprehensive system testing, the efficient operation and long-term stability of the solar glass curtain wall system can be ensured. With the increasing emphasis on green buildings and sustainable development concepts, photovoltaic curtain walls, as an innovative building-integrated solar solution, have broad market prospects and will become an important component of the future construction industry.


7 The installation of solar glass curtain walls is a systematic project that involves multiple stages


Inquiry

QUICK LINKS

Privacy Policy

ABOUT

PRODUCTS

+86-020-39201118

 +86 17727759177                                 inbox@terli.cn
 Whatsapp: +86 18666271339
 Facebook:TERLI Solar / Terli Solution
LinkedIn:  TERLI SOLUTION
 No. 52, Dangang West Street, Shiqi Village,Panyu, Guangzhou, China. 
213 Shinan Road, Nansha District, Guangzhou, China.
Contact us
© 2021 All right reserved Guangzhou TERLI New Energy Technology Co., Ltd.  Sitemap / Powered by leadong